Propeller

Propeller

Propeller

Tittle

Showing posts with label repairs. Show all posts
Showing posts with label repairs. Show all posts

Saturday, 22 September 2018

AMBODE ORDERS IMMEDIATE REPAIR OF ROADS.



Governor Akinwunmi Ambode has ordered the immediate repair of all roads that have been affected by potholes across the state in order to bring relief and succor to the generality of the motoring public and residents.



Making this disclosure in his office yesterday, was the Commissioner for Works and Infrastructure, Engr Ade Akinsanya who said that due to the perennial rainfall witnessed in the last few weeks, repair work on many roads in the state were suspended but that with the rains subsiding, there is need to intensify efforts in completing repairs where it has started but more importantly carrying out massive repair across the state.

Akinsanya said further that the Public Works Corporation (PWC) with help from some contractors have been mandated to move to sites and commence work immediately. The operation “fix the pothole” will last for about 3 - 4 weeks

He therefore appealed to residents and motorists to co-operate with them by following the traffic diversion put in place to ensure the early and smooth completion of the repair works.

It would be recalled that earlier this year, the Lagos state Government embarked on repair and rehabilitation of 115 roads carried out by the Public Works Corporation  apart from the 48 major roads totaling 129km that were rehabilitated and upgraded by the Ministry of Works and Infrastructure while 25 other road projects totaling 94km are ongoing.

Monday, 20 August 2018

LASTMA, FRSC Give Alternative Routes As Lagos Shuts Third Mainland Bridge On Thursday



The Third Mainland Bridge, which is one of the three bridges from Lagos Island to the Mainland, will on Thursday, August 23, be shut for four days, according to the state government.



This was disclosed in a statement signed on Sunday by the Lagos State Deputy Director, Public Affairs Ministry Of Works and Infrastructure, Sina Thorpe.
The bridge, which will be closed a day after 2018 Eid-el-Kabir celebration, is to allow investigative Maintenance Test to be carried out on the Bridge.

The shutdown will start from midnight of August 23 to midnight of August 26, 2018.
The federal government had earlier announced plans to shut the bridge in July but postponed the action after consulting with the state government and other stakeholders.

Reacting to the closure last month, the Federal Road Safety Corps (FRSC) and Lagos State Traffic Management Authority (LASTMA) also advised Lagos residents to use Bus Rapid Transit (BRT) and waterway transportation during the repair of Third Mainland Bridge.

FRSC speaks on alternative routes:

“We advise residents in that axis to ensure that they use alternative routes or other means of transportation to avoid traffic jam.

“Motorists who have nothing to do at the Lagos Island should stay off at this period and people should make use of waterways and BRT that has designated routes.

“People from Ikorodu going to Apapa should endeavour to use waterways transport system, at least for the main time to avoid delay on the road.”

“We are identifying various routes to cover during the process of repair like Cater Bridge; Ido to Ijora Olopa to Eko Bridge.

“Mostly, the vehicular movement will focus on Ikorodu Road up to Eko Bridge; but I am assuring you that enough personnel will be deployed to curb gridlocks.”

Meanwhile, the Lagos government urged motorists and residents to minimise non-essential travel and movements during the four-day closure.

LR